OUR PROJECTS

Toyota Toyotetsu

PROJECT INFO

Project:
Toyota Toyotetsu Gebze Factory, Extension Project
Customer:
Hazama Ando Corporation
Year:
2015
Place:
Kocaeli, Gebze
Applcation:
Bored Pile, Jet Grout, Mini Pile, Anchorage

A total of 15.000 m, ø60 cm and ø80 cm jet grout column have been constructed within the scope of soil improvement of Toyotetsu Gebze Factory Extension Project. In addition a total of 2.000 m, ø80 cm bored pile have been constructed for the retaining walls. 750 m of ø30cm mini pile and 600 m of prestressed anchorage have been constructed for a pit excavation inside the existing factory.
Before Extension Project; 20 soil boring (345m), geophysical work and pressuremeter test were performed for Toyotetesu Factory Extension Area Project.

Services given:

Soil InvestigationGeotechnical DesignSoil ImprovementShoring Systems






Previus Next

<
>
x


 


Temel Müteahhitleri Derneği Geobos, is a member of 'Temel Müteahhitleri Derneği'.